Continued from page 1
It also connects the F-Ring Road with the Whole Sale Market and Mesaimeer Street.
The Rawdat Al Khail Road project includes building an 8-km long dual carriageway road with three lanes in each direction, in addition to building six multi-level interchanges -- the East Industrial Interchange, Karwa Interchange, Barwa Interchange, Barwa Village access Interchange, Woqod Interchange, and Al Jazeera Interchange on the F-Ring Road.
Abdullah Dhafer al Hajri, the first Qatari national to pass through the bridge right after its opening, lauded the project and commented on its importance in boosting traffic flow, especially traffic coming from HIA and Al Wakra towards Doha.
The opening was attended by Eng. Nasser bin Ali al Mawlawi, President of the Public Works Authority, Eng. Jalal Yousef Al Salhi, Director of the Infrastructure Affairs, Eng. Nasser Ghaith al Kuwari, Manager of the Expressway Projects Department, and Engineer Yousef al Emadi, Manager of the Roads Maintenance Department in Ashghal.
From the Traffic Department of the Ministry of Interior (MoI) in attendance was Brigadier Mohamed Saad al Kharji, Director of Traffic Department, Brigadier Mohamed Marafi, head of Planning and Traffic Safety, and Abdulrahman al Sulaiti, member of the Central Municipal Council for the 10th District.